Tuesday, October 30, 2007

Brickwork completed.


The brickwork for the front is completed, and there is a lot of drywall laying around in the house.

Friday, October 26, 2007

Brickwork


Brickwork for the front of the house has been started.

Thursday, October 25, 2007

Pre Drywall Meeting

Kurt and I went around and inspected the house so far. Yes, we go and look pretty often, but it's nice to go through each room and take the time to inspect everything.

We did find 2 small hiccups that need to be addressed. There's no gas line for the gas stove, and it appears that there's no light inside the master bath area where the shower is located.

On the plus side, the phone jack has been moved from behind the refridgerator to a more suitable location.

They intially told us that it's 8 weeks from the time of the pre-drywall meeting. I'm crossing my fingers that we're in by the end of the year. If not, it's not a huge deal, but I did mention that we were going ot move into the back yard on January 13th. Rent goes up $150 per month once our lease expires.

Wednesday, October 24, 2007

Pre-drywall Meeting Tomorrow

We meet with the builder tomorrow at 7:45.

Monday, October 22, 2007

Insulation



Insulation and Windows are going in today.

Friday, October 19, 2007

Electrical


Electrical wiring is being done. We've only found 1 snag, and that's where they appeared to have wired the phone jack for the kitchen behind the refridgerator.

Thursday, October 18, 2007

HVAC




The rough HVAC has been installed. Mostly just pipes.