Wednesday, December 19, 2007

Walk through

No pictures for this one. The power was turned on shortly before we arrived at 2:30. We actually had to postpone the meeting because of this. Here's a shortenend list of issues. Of course, we found dings and areas that needed to be repainted, but here are "major" issues that we found.

In no particular order:

1. Master Bathroom Fan didn't work
2. Guest Bathroom fan didn't work.
3. Window in the front door had a hairline crack
4. Ripped vinyl in kitchen.
5. Gutter on the back of the house was covered in dirt.
6. Doors in the house drug on the carpet.
7. Hardwoods in formal dining area not aligned properly.

Other than that, it appear's we ready to go and have another walk through the day that we close.

Sunday, December 16, 2007

Carpet




Pictures of the carpet. It's been so long since we made our initial selections, that I've forgotten the particular type of carpet. It's definitely a much better grade than what we have in the apartment. Right now, the house looks very.. brown.

Thursday, December 13, 2007

Chair Rail and Hardwoods





Chair rail is in, and hardwoods have been installed. The carpet and padding are being installed now.

We have a initial walkthrough scheduled for Tuesday. Other than the punchlist, there really isn't a whole lot left.

Wednesday, December 5, 2007

We're getting there..


Within the last week, the hardwood in the foyer and formal dining rooms has been installed. The sod (I hesitate to call it grass in the beginning of December) has been put outside, along with the accompaning sprinker system. There's a 12' maple in the front yard, and a good amount of shrubbery. The outdoor heating/cooling units have been installed.

We did have minor issue in the back yard, where they left a stump from a tree. Kurt asked them to remove it and it appears to have been done. I haven't really been out to the house as often as I would like to go, now that it's dark when I get home in the evenings.

Friday, November 30, 2007

Kitchen



We went in yesterday at lunch and took some pictures. Here's one of the kitchen cabinets with the countertop. There's a protective cover on the counter, so it can be hard to see unless you look closely.

They're also grading our yard out for the sprinkler system and grass.

Toilets are in. Door knobs are now on. Vinyl is down in the kitchen and bathrooms. Appliances are in (dishwasher, fridge, microwave, and stove).
Lights and ceiling fans have been installed as well.

Thursday, November 29, 2007

Locked



The doors are now locked after working hours, so it'll be a little harder to get pictures. The countertops are in, kithen floors are in, and there are now recepticles for power downstairs.

Here's my first "what were they thinking" picture. The sidewalk outside the front of our home.

Friday, November 23, 2007

Painting



90% of the house has been painted. This includes doors, trimwork and walls. Here's a picture of our formal living room.